Project documents will be uploaded throughout the study as they become available.
The attached documents are in PDF format; therefore, you will need a separate application to view them. One such application is Adobe Acrobat Reader Get Adobe Acrobat Reader, which is available for Windows and Mac.
Second Public Hearing Study Documents (January 2022)
Southern PD&E Study Documents (419235-2)
Cultural Resource Assessment Survey Report (CRAS) 16.15 MB
Cultural Resource Assessment Survey Report for Pond Sites 19.94 MB
Contamination Screening Evaluation Report (CSER) – Draft 158.72 MB
Historic Resources Survey Update (HRSU) 18.52 MB
Location Hydraulic Report (LHR) – Draft 20.11 MB
Natural Resources Evaluation (NRE) 41.65 MB
Noise Study Report (NSR) – Draft 31.24 MB
Preliminary Engineering Report (PER) – Draft 61.50 MB
Pond Siting Report (PSR) – Draft 226.12 MB
Project Traffic Analysis Report (PTAR) – Vol 1 of 2 5.08 MB
Project Traffic Analysis Report (PTAR) – Vol 2 of 2 60.73 MB
Type 2 Categorical Exclusion – Draft 1.46 MB
Northern PD&E Study Documents (419235-3)
Cultural Resource Assessment Survey Report (CRAS) – Draft 16.32 MB
Cultural Resource Assessment Survey Report for Pond Sites 35.11 MB
Contamination Screening Evaluation Report (CSER) – Draft 181.37 MB
Conceptual Stage Relocation Plan (CSRP) – Draft 32.50 MB
Historic Resources Survey Update (HRSU) – Draft 23.82 MB
Location Hydraulic Report (LHR) – Draft 86.17 MB
Noise Study Report (NSR) – Draft 19.78 MB
Natural Resources Evaluation (NRE) 42.98 MB
Preliminary Engineering Report (PER) – Draft 23.16 MB
Pond Siting Report (PSR) – Draft 109.05 MB
Project Traffic Analysis Report (PTAR) – Draft 21.74 MB
Type 2 Categorical Exclusion – Draft 3.95 MB
First Public Hearing Study Documents (April 2010)
To view the draft study documents that were available for the First Public Hearing in April 2010, please click here.