• Active Study

Public Involvement

The US 41 / SR 54 Project Development & Environment (PD&E) study process will provide many opportunities for the public to view information about the project and to comment on the proposed improvements. Public involvement activities will continue throughout the duration of the project.

Anyone who would like to be placed on the mailing list should contact the FDOT Project Manager.

Public information meetings will provide information on the project status, design concepts, and other study considerations. They will also provide an opportunity for those who have an interest in the proposed project to comment on the study’s findings. An official public hearing will be held to present conclusions reached about improvement options and project effects. Public statements made at the hearing are recorded in the official public hearing transcript, which must be reviewed by Federal Highway Administration (FHWA) before approval of the study findings are granted.

Public Hearing

The FDOT held a Public Hearing for the US 41 at SR 54 Project Development & Environment (PD&E) Study for Proposed Improvements to the Intersection at US 41 (SR 45) and SR 54 on December 10, 2015. The Public Hearing was held to involve all interested parties in the PD&E process, to inform them of the project’s recommended alternative and to solicit comments for the official public record.

Draft project documents were available for public review from Thursday, November 19, 2015 to Monday, December 21, 2015.

Public Hearing Materials

Public Hearing Presentation

download video

Aerial Roll Plot – Alternative 3A (1 of 2) 8.29 MB

Aerial Roll Plot – Alternative 3A (2 of 2) 9.39 MB

Aerial Roll Plot – Alternative 3C 18.88 MB

Alternative 3A Rendering 3.36 MB

Alternative 3C Rendering 364 KB

Existing Year (2012) & Design Year (2040) Traffic Delays With & Without Delays 4.18 MB

Federal and State Guidance and Requirements 482 KB

PD&E Study Evaluation Matrix 323 KB

Project Location Map 423 KB

Public Hearing Ad 134 KB

Public Hearing Newsletter (Mailed November 2015) 1.37 MB

Schedules 262 KB

Welcome Board 993 KB



What’s New?

The FDOT held a Public Hearing for the US 41 at SR 54 Project Development & Environment (PD&E) Study for Proposed Improvements to the Intersection at US 41 (SR 45) and SR 54 on December 10, 2015.

 

>> read more

Send us your Comments

Your comments are very important. You may send us your comments via the Comments page on this web site so that they can be considered as part of this study.

 

>> read more

Project Schedule

The US 41 / SR 54 project is currently in the Project Development & Environment (PD&E) study phase of the FDOT’s 5-step highway development process.

 

>> read more

Contact Information

For more information or to comment, please contact:

 

Kirk Bogen, PE, Environmental Management Engineer
FDOT District Seven - Intermodal Systems Development Office
11201 N. Malcolm McKinley Drive
MS 7-500
Tampa, FL 33612-6456
(813) 975-6448
(800) 226-7220
kirk.bogen@dot.state.fl.us


Para preguntas en Español
Valoramos la opinión del público sobre este proyecto. Si usted tiene preguntas o comentarios o si simplemente desea mas información en Español, favor ponerse en contacto con el ingeniero a cargo de este proyecto, la señora Elba Lopez al teléfono (813) 975-6403.