• Completed Study

Project Documents

Project information and documents are provided below.

They are in PDF format, therefore, you will need a separate application to view them. One such application is Adobe Acrobat Reader, which is available for Windows and Mac.
Air Quality Technical Memorandum 1.91 MB

Approved Design Change Re-evaluation (Approved 10/30/19) 1.70 MB

Bridge Replacement Memorandum 28 KB

Comments and Coordination Report 34 MB

Conceptual Stage Relocation Plan 32.33 MB

Geotechnical Technical Memorandum 6.58 MB

Level I Contamination Screening Evaluation Report 23.11 MB

Location Hydraulic Report (LHR) Technical Memorandum 23.70 MB

Natural Resource Evaluation Technical Memorandum 30.43 MB

Noise Study Report 11.44 MB

Preliminary Engineering Report 16.58 MB

Project Commitment Record Form 59 KB

Project Traffic Analysis Report 8.48 MB

Project Traffic Analysis Report Appendices 15.74 MB

Public Hearing Scrapbook 42.4 MB

Public Hearing Transcript 5.58 MB

Stormwater Management Facility (SMF) Siting Report 41.55 MB

Utility Assessment Package 54.19 MB

Water Quality Impact Evaluation Checklist 280 KB

Upcoming Meetings

There are no upcoming meetings.

 

>> read more

What’s New?

The Florida Department of Transportation (FDOT) completed a Project Development & Environment (PD&E) Re-evaluation Study for proposed improvements to US 19 (SR 55) from 66th Avenue North to SR 690 / 118th Avenue North in Pinellas County. This project is a re-evaluation of a PD&E study originally completed in 1990. Re-evaluations verify that the study results are in compliance with applicable Federal and State laws before moving into a production phase for the area. This re-evaluation serves as a check on the commitments made by FDOT during the original study process. The re-evaluation documents compliance with Federal laws and any changes that may have occurred since the approval of the original final recommendations.

 

>> read more

Project Schedule

The US 19 PD&E Re-evaluation Study began in February 2016. The project activities included collecting information, developing roadway improvement alternatives and evaluating the potential environmental and social effects of the “no-build” and “build” alternatives.

 

A public hearing was conducted on Tuesday, October 30, 2018 from 5:30 p.m. to 7:30 p.m. at the Tampa Bay Regional Planning Council.

 

On October 30, 2019, FDOT’s Office of Environmental Management (OEM) approved the US 19 PD&E Re-evaluation.

 

>> read more

Contact Information

For more information or to comment on the completed environmental phase of the project, please contact:

 

Environmental Management Office
Florida Department of Transportation, District Seven
11201 N. McKinley Drive
MS 7-500
Tampa, FL 33612-6456
(813) 975-6000
(800) 226-7220


For issues related to the final design of this project, please contact:

 

Liz Winters, Design Project Manager
Florida Department of Transportation, District Seven
11201 N. McKinley Drive
MS 7-600
Tampa, FL 33612-6456
(813) 975-6169
(800) 226-7220
elizabeth.winter@dot.state.fl.us


For all other inquiries related to this project, please contact:

 

Kristen Carson, Public Information Director
Florida Department of Transportation, District Seven
11201 N. McKinley Drive
MS 7-110
Tampa, FL 33612-6456
(813) 975-6060
(800) 226-7220
kristen.carson@dot.state.fl.us


Para preguntas en Español
Valoramos la opinión del público sobre este proyecto. Si usted tiene preguntas o comentarios o si simplemente desea más información sobre este proyecto, por favor ponerse en contacto con el señor Manuel Flores al teléfono (813) 975-4248 o al correo electrónico manuel.flores@dot.state.fl.us.