• Active Study

Alternatives Public Workshop (2021)

The Florida Department of Transportation (FDOT) District Seven held and Alternatives Public Workshop for the US 41/SR 45/Land O’Lakes Boulevard at SR 54 Feasibility Study. At the workshop, the Department presented information and received public input from interested persons regarding the proposed improvements.

The workshop was held on Thursday, September 16, 2021 from 5:30 PM to 7:30 PM with options to attend both in-person and online. The same materials were presented for both the in-person and virtual sessions. Meeting materials became available on the project website Friday, September 10th, 2021.

In-Person Session

The in-person session was held at the Keystone Community Church, 21010 SR 54, Lutz, FL from 5:30 PM to 7:30 PM. The workshop consisted of an informal, open house format and there was a short video presentation discussing general project details which ran continuously throughout the workshop. The public was able to attend anytime during the two-hour meeting to review project information and talk one-on-one with project team members.

Registration was not required to attend in-person.

Virtual Session

Virtual attendees were required to register online at the following link via GoToWebinar: https://register.gotowebinar.com/register/2594477323187338512.

Virtual online attendees were able to use the sign-in link emailed to them after registering. Between 5:30 PM and 7:30 PM, attendees were able to view materials online and ask questions to FDOT staff through the GoToWebinar chat box.

A call-in option was not available.

Written comments could be submitted at any time during the workshop, or mailed back prior to and up to 10 days after the workshop (postmarked by Monday, September 27, 2021) to the address located on the back of the comment form. Comments may also be submitted by visiting the project website here.

Alternatives Public Workshop Materials

Alternatives Public Workshop Presentation

download video

Access Examples – Alternative 1

Access Examples – Alternative 2

Access Examples – Alternative 3

Alternative 1 Concept – Single Point Urban Interchange (SPUI)

Alternative 1 Pedestrian Access

Alternative 2 Concept – Parallel Flow Intersection (PFI)

Alternative 2 Pedestrian Access

Alternative 3 Concept – Continuous Flow Interchange (CFI) With Overpass

Alternative 3 Pedestrian Access

Evaluation Matrix

Federal and State Requirements

No-Build Alternative Pedestrian Access

Project Study History and Schedule / Project Funding

Title VI Board

Volume 3 Alternatives Public Workshop Newsletter (September 2021)

Welcome Board

What’s New?

The FDOT held an Alternatives Public Workshop on Thursday, September 16th, 2021 from 5:30 PM – 7:30 PM.

 

>> read more

Send us your Comments

Your comments are very important. You may send us your comments via the Comments page on this web site so that they can be considered as part of this study.

 

>> read more

Project Schedule

The Project Development and Environment (PD&E) Study is underway.

 

>> read more

Contact Information

For more information or to comment, please contact:

 

Kirk Bogen, PE, Environmental Management Engineer
FDOT District Seven - Intermodal Systems Development Office
11201 N. McKinley Drive
MS 7-500
Tampa, FL 33612-6456
(813) 975-6448
(800) 226-7220
kirk.bogen@dot.state.fl.us


Comuniquese Con Nosotros
Si usted tiene preguntas o comentarios o si simplemente desea mas informacion sobre este proyecto, favor de ponerse en contacto con nuestro representante, el señor Manuel Flores, al teléfono (813) 975-4248 o correo electrónico manuel.flores@dot.state.fl.us.