• Active Study

Project Documents

The US 41 / SR 54 Project Development & Environment (PD&E) study process will provide many opportunities for the public to view information about the project and to comment on the proposed improvements. Project information and documents will be uploaded to the project website for review when they become available.

They are in PDF format, therefore, you will need a separate application to view them. One such application is Adobe Acrobat Reader, which is available for Windows and Mac.

Air Quality Technical Memorandum 279 KB

Final Conceptual Stage Relocation Plan (Draft) 5.60 MB

Final Draft Level 1 Contamination Screening Evaluation Report (CSER) 10.95 MB

Location Hydraulics Report (Draft) 4.93 MB

Noise Study Report (Draft) 15.37 MB

Preliminary Engineering Report (Draft) 11.63 MB

Technical Traffic Memorandum 21.39 MB

Type 2 Categorical Exclusion Determination Form 5.36 MB

Utility Assessment Package 195.08 MB

Wetland and Biological Assessment Report (Draft) 256.53 MB

 

Alternatives Public Workshop Materials

Alternatives Public Workshop Presentation

download video

Access Examples – Alternative 1

Access Examples – Alternative 2

Access Examples – Alternative 3

Alternative 1 Concept – Single Point Urban Interchange (SPUI)

Alternative 1 Pedestrian Access

Alternative 2 Concept – Parallel Flow Intersection (PFI)

Alternative 2 Pedestrian Access

Alternative 3 Concept – Continuous Flow Interchange (CFI) With Overpass

Alternative 3 Pedestrian Access

Evaluation Matrix

Federal and State Requirements

No-Build Alternative Pedestrian Access

Project Study History and Schedule / Project Funding

Title VI Board

Volume 3 Alternatives Public Workshop Newsletter (September 2021)

Welcome Board

Public Hearing Materials

Public Hearing Presentation

download video

Aerial Roll Plot – Alternative 3A (1 of 2) 8.29 MB

Aerial Roll Plot – Alternative 3A (2 of 2) 9.39 MB

Aerial Roll Plot – Alternative 3C 18.88 MB

Alternative 3A Rendering 3.36 MB

Alternative 3C Rendering 364 KB

Existing Year (2012) & Design Year (2040) Traffic Delays With & Without Delays 4.18 MB

Federal and State Guidance and Requirements 482 KB

PD&E Study Evaluation Matrix 323 KB

Project Location Map 423 KB

Public Hearing Ad 134 KB

Public Hearing Newsletter (Mailed November 2015) 1.37 MB

Schedules 262 KB

Welcome Board 993 KB

What’s New?

The FDOT will hold an Alternatives Public Workshop on Thursday, September 16th, 2021 from 5:30 PM – 7:30PM.

 

>> read more

Send us your Comments

Your comments are very important. You may send us your comments via the Comments page on this web site so that they can be considered as part of this study.

 

>> read more

Project Schedule

The US 41 / SR 54 project is currently undergoing a Feasibility Analysis.

 

>> read more

Contact Information

For more information or to comment, please contact:

 

Kirk Bogen, PE, Environmental Management Engineer
FDOT District Seven - Intermodal Systems Development Office
11201 N. Malcolm McKinley Drive
MS 7-500
Tampa, FL 33612-6456
(813) 975-6448
(800) 226-7220
kirk.bogen@dot.state.fl.us


Para preguntas en Español
Valoramos la opinión del público sobre este proyecto. Si usted tiene preguntas o comentarios o si simplemente desea mas información en Español, favor ponerse en contacto con el señor Manuel Flores al teléfono (813) 975-4248, o correo electrónico manuel.flores@dot.state.fl.us