Project information and documents are provided below.
They are in PDF format, therefore, you will need a separate application to view them. One such application is Adobe Acrobat Reader, which is available for Windows and Mac.
Air Quality Technical Memorandum 1.91 MB
Approved Design Change Re-evaluation (Approved 10/30/19) 1.70 MB
Bridge Replacement Memorandum 28 KB
Comments and Coordination Report 34 MB
Conceptual Stage Relocation Plan 32.33 MB
Geotechnical Technical Memorandum 6.58 MB
Level I Contamination Screening Evaluation Report 23.11 MB
Location Hydraulic Report (LHR) Technical Memorandum 23.70 MB
Natural Resource Evaluation Technical Memorandum 30.43 MB
Preliminary Engineering Report 16.58 MB
Project Commitment Record Form 59 KB
Project Traffic Analysis Report 8.48 MB
Project Traffic Analysis Report Appendices 15.74 MB
Public Hearing Scrapbook 42.4 MB
Public Hearing Transcript 5.58 MB
Stormwater Management Facility (SMF) Siting Report 41.55 MB
Utility Assessment Package 54.19 MB
Water Quality Impact Evaluation Checklist 280 KB
From State Road 694 (Gandy Boulevard) in Pinellas County to State Road 595 (Alternate US 19)
WPI Seg. No.: 7116860 | Pinellas and Pasco Counties, Florida
- Administrative Action Draft Environmental Impact Statement 1
- Administrative Action Draft Environmental Impact Statement 2
- Administrative Action Finding Of No Significant Impact 1
- Administrative Action Finding Of No Significant Impact 2
- Design Alternatives Report Addendum
- Final Report Elevated Freeway Alternative
- Hazardous Waste Site Inventory Report
- Location Hydraulic Report
- Permit Coordination Report
- Revised Preferred Design Alternative for U.S. 19
Previous US 19 (SR 55) Re-evaluation Documents
- Advance to Construction Authorization (April 30, 2009)
- Advance to Construction Authorization (June 1, 2011)
- Construction Authorization (November 6, 2000)
- Construction Authorization (August 30, 2005)
- Design Authorization (March 3, 1994)
- Design and Construction Authorization (June 29, 1995)
- Federally Funded Construction Authorization (March 6, 2006)
- Federally Funded Right-of-Way Acquisition (September 24, 2003)
- Federally Funded Right-of-Way Acquisition (March 31, 2004)
- Federally Funded Right-of-Way Authorization (May 3, 2006)
- Right of Way Re-evaluation (September 8, 2015)